Logo von power2nature in dunkel.
Energy infrastructureDigital infrastructureCompanyContact
EN
Deutsch
English

EUROPEAN INFRASTRUCTURE.
LOCALLY DEVELOPED.

We develop sites for energy and digital infrastructure – from the initial potential analysis to investment readiness.

Aerial view of an industrial area with large factory buildings, their roofs covered in numerous solar panels, surrounded by agricultural fields and rolling hills under a cloudy sky.

Municipalities that trust us

Forstinning

Pastetten

Anzing

Wartenberg

Why power2nature?

We develop sites in collaboration with those who make the decisions on the ground: property owners, mayors, and local councils. We define the site conditions first and then select the right partner, not the other way around. And we bring with us a network of operators, investors, and energy companies that has been growing for over fifteen years.

Our Business Areas

Two infrastructures.
A logic of development.

We develop sites for energy and digital infrastructure. Two fields, one development process with distinct technical requirements: from potential analysis and municipal coordination to investment readiness.

Aerial view of a solar array on the right and overgrown terrain with trees and plants on the left.

Energy infrastructure

Ground-mounted photovoltaics and battery storage on suitable sites with a viable permitting status.

on energy infrastructure
Aerial view of a data center featuring several large buildings, parking areas between them with marked accessible parking spaces, green lawns, and building shadows.

Digital infrastructure

Data center sites with reliable grid connections, permitting feasibility, and local acceptance.

on digital infrastructure

Voices from the Municipality

What mayors say about working with power2nature.

"It was particularly valuable for us that you guided the entire municipal decision-making process for ground-mounted photovoltaics in a clear, structured, and practical way—from GIS-based site analysis and the collaborative development of criteria within the municipal council, to dialogue with landowners and the selection of suitable investors."

Photo of Peter Deischl, First Mayor of Pastetten (until 2026).
Peter Deischl
First Mayor, Municipality of Pastetten (until 2026)

"With the support of power2nature, we were able to increase the installed photovoltaic capacity in our municipality tenfold in less than four years."

Photo of Rupert Ostermair, First Mayor of Forstinning (until 2026).
Rupert Ostermair
First Mayor, Municipality of Forstinning (until 2026)
Our approach

Six steps to investment readiness

A development process for solar parks and data centers.

Identification

The starting point is a specific plot of land or a municipal site analysis. Using GIS, we identify sites with potential for energy or digital infrastructure.

Coordination

We involve owners, mayors, and local councils early on and support the municipality in setting its own guidelines.

Qualification

We examine the land, planning law, and grid connection in detail. The result is a solid foundation for further development.

Development

Within the agreed framework, we make the site robust: planning and usage rights, grid and fiber-optic connections. With every step, the value of the site increases.

Selection

We vet potential operators and investors based on site requirements, as well as their experience and financial strength. The site determines the partner.

Handover

The result is a site ready for investment: solid development progress, reduced risks, and an investor ready to build and operate.

Local benefits

Creating value where infrastructure is built.

Those who provide the land and bear the responsibility should also benefit. We clarify early on what a site brings to the municipality, the landowners, and the region, and make this the benchmark for selecting operators and investors.

Municipality

Solar parks provide the municipality with trade tax, most of which remains at the site, as well as a financial share of the electricity revenue, without the municipality having to invest itself. The same rule is set to apply to data centers from 2027: the majority of the trade tax will go to the municipality where the data center is located.

Landowners

Landowners learn what their land is worth for a solar park or data center and have a say in what is built on it. They secure long-term, predictable income, and the value of their property increases with every step of the development.

Region

Solar power makes the region more independent from energy imports, and local businesses can secure fixed prices through long-term power purchase agreements. Well-planned solar parks cause minimal soil sealing and create habitats for insects and birds. Data centers keep our data within the country, and their waste heat can supply heating networks.

Founder & Managing Director

Alexandru Ecker

Alexandru Ecker has been working in energy and infrastructure investment since 2010. At a European infrastructure fund for renewable energy, he was responsible for developing a project pipeline of up to 2.5 GW per year.

Since 2020, he has been using power2nature to develop sites in collaboration with landowners, mayors, and local councils. He bridges the gap between the criteria investors use to evaluate a site and the decision-making processes of local councils.

about the company
Photo of Alexandru Ecker, Founder & Managing Director of power2nature.

Direct line

Book an appointment directly, write to us, or give us a call.

Schedule an appointment
kontakt@power2nature.de
Show phone number
LinkedIn
Thank you! Your message has been sent.
Something went wrong. Please try again.
Logo von power2nature in hell.
HomeEnergy infrastructureDigital infrastructureCompanyContact
Legal noticePrivacy policyCookie policyCookie settings
© 2026 power2nature. All rights reserved.